Welcome to RCBC Savings Bank Corporate Center

RCBC Savings Bank Corporate Center is a 34-storey building located in the center of Bonifacio Global City.

ANNOUNCEMENT
Monthly With Load Test of Genset

Please be informed that RSBCC PMO Engineering will conduct the Monthly WITH LOAD TEST of GENSETS on September 29, 2018 (Saturday). Expect transfer of power from COMMERCIAL MERALCO to EMERGENCY GENSET and vice-versa between 10:00am to 1:00pm.

 

Rest assured that PMO Engineering team will be on top of the activity

 

Thank you for your usual support and cooperation.

BGC Wide Road Closure

In relation with the BGC Wide Drill this coming Thursday, 27 September 2018 from 10:00AM - 12:00NN. Please inform and advise all your employees and guests to expect heavy traffic while the drill is on-going. Roads are closed in the following areas:

 

  • 5th Ave (26th St. to 32nd St.)
  • 5th Ave (32nd St. to 34th St.)
  • 39th St. (Triangle Drive to 11th Ave.)
  • 10th Ave. (25th St. to Mckinley Pkwy)
  • 2nd Ave. (32nd St. to 31st St.) SB
  • 3rd Ave. (31st St. to 32nd St.)

 

Fire Detection and Alarm System Testing,

Please be informed that PMO Engineering will conduct Fire Detection and Alarm System TEsting on September 15 & 16, 2018 (Saturday-Sunday) from 9:00am to 4:00pm

Please expect intermittent sounding of bells and homing of elevators during the activity.

PMO Advisory No. 38.pdf

September 2018 Activities

Please be informed of our activites this September 2018:

  • BGC Wide Earthquake Drill this coming September 27, 2018
  • Earthquake Preparedness Seminar scheduled on September 14, 2018
  • Final Meeting with ERT Floor Captains regarding BGC Wide Earthquakw Drill on September 21, 2018

 

Fire Detection and Alarm System Testing

Please be informed that PMO Engineering will conduct Fire Detection and Alarm System TEsting on September 08, 2018 (Saturday) from 9:00am to 4:00pm.

Please expect intermittent sounding of bells and homing of elevators during the activivty.

 

This is preparation for the upcoming BGC Wide Earthquake Drill this coming September 27, 2018 (Thursday).

 

Thank you for your usual support and cooperation.

PMO Advisory No. 34.pdf

Genset Source Emission Test (SET)

Please be informed that the Annual Source Emission TEst (SET) of RSBCC is scheduled on September 01, 2018 (Saturday). The purpose of the test is to determine the compliance of the Air Pollution Sources (Gensets) with the emission standard of DENR.

To conduct our test, our team will be running, for an hour, each genset without load. THe activity will start at 9:00am and will be completed before 3:00pm.

 

 

Gate Pass Application

Please be informed of the following gate pass signing and releasing schedule from Monday to Friday:

 

Signing Cut Off

Releasing Time

1st Batch

10:00am

12:00nn

2nd Batch

2:00pm

5:00pm

Approved gatepass can only be claimed at the specific time mentioned abovr presenting the claim stub issued by the guard on duty. Strictly NO SIGNING OF GATEPASS ON WEEKENDS AND HOLIDAYS.

demos

Designated Smoking Area Re-Opening

Please be informed that TAGUIG CITY LGU (Local Government Unit) already released the outdoor DSA permit of RCBC Savings Bank Corporate Center. Starting July 26, 2018 (Thursday), the Property Management Office is re-opeing the DSA located at 7th Floor Upper podium parking area.

RSBCC PMO ADVISORY 2018-29 DSA.pdf